Work Order Material Usage - 2
When adding materials in a Work Order, the other option, the Spare Parts List of the Asset Group, can be used. If spare parts are selected in the group information of the asset selected in the work order, the relevant spare parts can be used here.

To add spare parts (material) information to the Asset Group, go to the definitions page under the Asset menu and select Asset Groups. The Asset group to which spare parts information is desired to be added is entered with a double-click or change button. By clicking on the Spare Parts List tab on the left, the requested spare parts are added from the page that opens.
