Skip to main content

Work Order Material Usage - 3

When adding materials to the Work Order, the other option, Maintenance / Breakdown Spare Parts List, can be used. If spare parts are selected in the information of the maintenance / fault code selected in the work order, the relevant spare parts can be used here.

![](https://docsbimser.blob.core.windows.net/imagecontainer/İş%20Emri%20Ar iz%20code%20material%20selection-3d565f47-ee86-4823-ac67-2767c340e43a.png)

To add spare parts (material) information to the Maintenance / Fault Code, go to the definitions page under the Maintenance menu and select Maintenance / Fault Codes. The Maintenance / Fault Code to which spare parts information is desired to be added is entered with the double-click or change button. By clicking on the Materials tab on the left, the requested spare parts are added from the page that opens.

![](https://docsbimser.blob.core.windows.net/imagecontainer/İş%20Emri%20Ar iz%20code%20material%20selection2-4b62d866-2907-4e24-894d-6c1c6fc99191.png)