ACTION PLANNING ACCORDING TO HOLIDAYS
BSAT PARAMETER
SAT >
BSAT >
Configuration Settings >
Parameters The numerical values of the days are written in the parameter value "82" "Which days should be working days?" as 1 (Monday), 2 (Tuesday), 3 (Wednesday), 4 (Thursday), 5 (Friday), 6 (Saturday), 7 (Sunday) by separating them with commas. In this way, working days and holidays can be determined.
Then, in the SAT >
Action >
Action Parameters menu, click on "49" "Take holidays into account when opening actions? The parameter value "E" is written to (E/H). In this way, the days determined during the action planning will be calculated based on the working days. By configuring the parameter value No. 49 as specified, the parameter value "50" "Actions can be postponed forward/backward according to holidays (Forward: I, Back: G)" is determined. If the value of the relevant parameter is selected as "Forward", it will give the next business day, and if it is determined as "Back", it will give the action plan to the previous business day.