Multi-Action Creation
1- It is used to open more than one action at the same time, on a single screen.
2- The parameter number 11 "Will the Multi-Action Opening Feature be used?" in the action module is marked as "Yes".
3- After logging into the Main Action Plan with the "Items" button in the IMS / Action / Planning menu, the "Multiple Action" button is pressed.
4- On the screen that opens, enter the information of the actions to be added and press the "Add" button for each action. After all the actions are added, the actions are assigned with the "Save" button.